Track record

Robotic projects delivered

Ships in dock, terminal storage tanks and shipyard works across the UAE. One Abu Dhabi client has brought us back for four vessels in 2026.

Oct 2026 · Abu Dhabi, UAE

Vessel hull — side shell & flat bottom

Full hull hydroblasting, side shell and flat bottom. Two robots per shift, 24/7, standby robot on site, every shift logged.

Aug–Sep 2026 · Abu Dhabi, UAE

Container ship

Robotic hydroblasting of side shell, hull and flat bottom.

Aug 2026 · Taweelah, Abu Dhabi

Landing craft

Robotic hydroblasting of side shell, bottom and underwater hull, with the swing-arm head on parts of the sides.

Jun–Jul 2026 · Abu Dhabi, UAE

Offshore support vessel

Robotic hull hydroblasting.

Apr–May 2026 · Sharjah, UAE

Terminal storage tanks — inside and out

Robotic UHP hydroblasting to WJ-2 on the external shells and inside the tanks, with a suspended cradle for access on a live terminal.

Apr–May 2026 · Sharjah, UAE

Tank internals

Crawler robot on the inner wall, cradle above for the upper strakes — water only, no grit inside the tank.

Oct–Nov 2025 · Dubai Maritime City

Ship-lift rail system

Manual UHP hydroblasting of the shipyard rail tracks.

Feb 2026 · Abu Dhabi, UAE

Ro-Ro ferry

Robotic hull hydroblasting.

✓
Letter of Appreciation from a leading UAE ship-repair yard, Oct 2026. Issued for robotic hydroblasting on three vessels — a Ro-Ro ferry, an offshore support vessel and a container ship. Available on request.
From site

Gallery

From site · video

Robots at work

Clean stripe, one passRobot leaves bare steel in a single pass — water only
Night shift24/7 operation under floodlights
Bow, dockedCrawler working the bow plating in drydock
Tank wallRobotic UHP on a storage tank shell
Side shellRemoving old coating down to steel
UHP jet testPump and head tested before every job