Robotic UHP hydroblasting · UAE & GCC
We take hulls & tanks back to steel. Robotically.
Our magnetic crawler robots deliver powerful UHP water jetting to remove coatings, corrosion and marine growth — achieving WJ-2 surface preparation with precision and efficiency.
- No grit, no dust, no spent abrasive
- 25–50 m²/h per robot
- Method statement & project file for every job
We operate it. We trust it. We supply it.
Robotic hull hydroblasting · Abu Dhabi, UAE · Oct 2026
2,800bar
UHP jet pressure
9robots
Hydro · sand · paint
25–50m²/h
Per robot, by pump size
24/7
Day + night shifts
SSPC-SP WJ / NACE WJ-2Cleanliness grade, as specified
ISO 8501-4Flash-rust grade after hydroblasting
ISO 8501-1 · Sa 2½Where an anchor profile is required
Project fileMethod, daily log, DFT & joint measurement
Repeat client4 vessels for one Abu Dhabi client in 2026
BEFOREAFTER · WJ-2
Drag the slider
Same stern, before and after WJ-2
Vessel stern in an Abu Dhabi dry dock. Left: old antifouling as docked. Right: illustrative view of the same stern at WJ-2 — old coating removed, steel ready for inspection.
Plan your job
How long will it take?
Enter your area and see the estimated robot time at WJ-2. We confirm every figure with a method statement and schedule.
—Robot hours
—Days, 2 shifts (20 h)
—Manual-lance days, same area
Estimate at WJ-2 on normal coating. Thick antifouling or heavy pitting runs slower. Manual comparison: 2 guns per pump, ≈ 75 m² per gun per 12-h shift.
Hi, I'm Max 👋
Questions about our robots, timing or your project? Ask me.
Questions about our robots, timing or your project? Ask me.
Max · Prime Shield assistantAI · English & العربية · text or voice
You can ask me:
AI answers may contain mistakes — our team confirms every offer.
